Skip to content
SYZi Labs

Studio notes

How to choose a software development company

A practical checklist: what to check before the first meeting, which questions to ask, what a contract should state, and the warning signs.

SYZi Labs8 min read

In this note

Choose a software development company by what you can verify, not by what it promises: a registered legal entity, shipped work you can open yourself, a written scope, and clear answers about who owns the code and the accounts when the project ends. SYZi Labs, the software and product studio of PT. Syairozi Technology Indonesia, wrote this checklist so it works on any vendor, including us. A company worth hiring will answer every question below without discomfort, and one that cannot has told you what you needed to know.

What to check before the first meeting

Three things can be checked from your desk, before you spend an hour in a meeting. None of them needs technical knowledge, and together they remove most of the vendors that would have cost you time.

  • A registered legal entity. Look for the full legal name of the company on its website, not only a brand name. You will sign a contract with that entity, receive invoices from it, and hold it to its commitments. If you cannot find out who you would be contracting with, ask, and treat a slow answer as information.
  • Shipped work you can open. Screenshots and logos prove very little. Look for something you can click through yourself: a live site, a working demo, an app you can install. Open it on your phone, try the obvious path, and see how it behaves when you do something unexpected.
  • Who actually does the work. Some companies design and build with their own people. Others sell the project and pass it to freelancers or another firm. Either can work, but you should know which one you are buying, and who you will be speaking to once the contract is signed.

Questions to ask, and what a good answer sounds like

The first meeting is where you learn how a company thinks. A good vendor asks you at least as many questions as you ask them. Bring these six, and listen for specifics rather than reassurance.

  1. How is the scope defined? A good answer describes a written document that lists the users, what each of them can do, the systems the software connects to, and what is deliberately left out. “We will follow your needs” is not a scope.
  2. How are changes handled? Changes are normal. What matters is whether there is an agreed way to raise one, estimate its effect on time and cost, and approve it in writing before work starts.
  3. What does a demo show, and what in it is real? Ask which parts run on real data and real logic and which are placeholders made for the presentation. A vendor who marks that boundary without being asked is showing you how they will report progress later.
  4. Who owns the source code and the accounts? Ask where the code will be stored and in whose name the hosting, domain, app store and third-party service accounts will be registered. The safest arrangement is that they are yours from the start, with the vendor given access.
  5. What does handover include? Expect the source code, access to every account, documentation for running and deploying the software, and a session where someone walks your team through it.
  6. What happens after launch? Ask who fixes defects found after delivery and for how long, how ongoing maintenance is arranged, and what a small change will involve a few months later.

Write the answers down during the meeting. Anything that matters to you should appear again in the proposal or the contract. If an answer given in the room is missing from the document that follows, raise it before you sign.

What a contract should state

A contract is where a conversation becomes something both sides can point to. This is not legal advice, and for a significant project it is worth having someone qualified read the document. As a buyer, though, you can check that these points are written down clearly enough that two people would read them the same way.

  • The scope, either in the contract or in an attached document it refers to by name.
  • The deliverables and how each one is accepted: who checks it, against what, and how long you have to respond.
  • The payment schedule, tied to deliverables you can see rather than to dates alone.
  • Ownership of the source code, the designs and the data, and the point at which it passes to you.
  • Which accounts and services are registered in your name, and who pays their running costs.
  • How a change to the scope is requested, priced and approved.
  • What is covered after delivery, such as fixing defects, and for how long.
  • Confidentiality for the business information you share.
  • What each side receives and owes if the project stops early.

Warning signs

None of these proves bad intent. Each one describes a way projects commonly go wrong, and each is easier to deal with before signing than after.

  • A price before any questions. A figure quoted before the vendor knows who will use the software and what it must do is a guess. It is either padded to cover the unknown or low enough to win the job and grow later.
  • No written scope. If the agreement is a total and a deadline, every disagreement later becomes your memory against theirs.
  • Accounts and domains owned by the vendor. If your domain, hosting or app store listing is registered under the vendor’s name, leaving them means asking their permission. Ask for these to be in your name from the first day.
  • Vague answers about maintenance. “We will take care of it” does not say who, for how long, or at what cost. Software that nobody is responsible for degrades quietly.
  • A demo that only works when they drive it. If you are not allowed to click through it yourself, you have seen a presentation, not a product.
  • Pressure to decide quickly. A discount that expires tomorrow is a sales technique. A serious project can wait a few days for you to read the proposal properly.

How to compare two proposals fairly

Two proposals for the same project rarely describe the same work, so comparing the totals first will mislead you. Put them side by side and compare what each one includes before you look at the price.

  1. List the users and workflows each proposal covers. Mark anything that appears in one and not in the other.
  2. Do the same for integrations, data migration, platforms, testing, documentation and training.
  3. Check what each one says about ownership, handover and the period after launch.
  4. Send both vendors the gaps you found and ask them to confirm whether each item is included, excluded or priced separately.
  5. Compare the prices only once both proposals describe the same work.

This is a short exercise, and it usually changes the picture. The lower proposal is often the one that left more out. Sometimes the higher one includes work you do not need yet, and that is worth knowing too. How each vendor responds to your questions about the gaps is also evidence: you are seeing how they behave when something is unclear, which is how most of the project will feel.

How SYZi Labs answers the same questions

It would be unfair to publish a checklist and not stand under it. SYZi Labs is part of Syairozi Group, and the legal entity behind it is named on this site. The projects shown here link to demos you can open yourself. The studio works in four stages: understand, shape, build, and verify and hand over. It publishes no price list, because an estimate is made against a scope agreed during shaping, not before it. The Services page describes the kinds of work it takes on.

If you are comparing vendors, send us the same questions you send everyone else, and judge the answers the same way. If another company answers them better for your project, hiring that company is the right decision.

Common questions

Should I choose the cheapest proposal? Only after you have confirmed that it covers the same work as the others. A lower total is often a narrower scope, and the difference tends to return later as change requests.

Is a freelancer or a company the better choice? It depends on the size of the work and on what happens if one person becomes unavailable. For either, ask the same questions about scope, ownership, handover and maintenance, and get the answers in writing.

Do I need technical knowledge to choose well? No. Almost everything on this list is about clarity and ownership, not technology. If you can tell a specific answer from a vague one, you can evaluate a vendor.

This is a studio perspective on how we work, not a reported case study or a client result.

  • ReadySeat

    A visual reservation experience built around choosing the exact seat.

  • Auden AI

    Conversational finance tracking that turns everyday messages into a record of money in and out.

Continue reading

Working on something related? Start a conversation